HOME   |   NEWSLETTER   |   CONTACT US      
  Shopping Cart:     0 Items      
   
               
Products Main Page
Details
eBooks
Legal & Contract Docs
Software
Specifications
 
Local:
Fax:
Email:
Office:
801.990.3170
801.990.3293
Send Us an Email
2825 E. Cottonwood Parkway
Suite 500
Salt Lake City, UT 84121
 
 
Asphalt Patch Specification
103
Your Price: $12.00
This specification includes requirements for a full depth hot mix asphalt pavement patch.
 
 
 
Description

This specification includes requirements for a full depth hot mix asphalt pavement patch. It specifies a Marshall Mix Design Asphalt AC-5, AC-10 or AC-20 based upon climatic conditions well as gradations for the aggregate binder materials. It references ASTM tests that must be met in the quality of the materials. It requires that the patch be saw cut and that at least 8 inches of compacted base course be replaced. It contains gradation and compaction requirements for the base material. It also contains a requirement that a soil sterilant be placed on the prepared base course before installation of the asphalt surface course. It contains the following sections: Summary, References, Materials, Performance, and Cleaning

This file is in Microsoft Word® format.

Format

Instant Download After Purchase

Requires zip file extractor

Requires Microsoft Word®

  Copyright © 2008 - King Engineering. All Rights Reserved.
HOME  |  COMPANY  |  PRIVACY  |  TERMS  |  ADMIN  |  CONTACT US